
AI Development Process
NX°
This document records the prompt engineering, decision-making rationale, and iterative development milestones accomplished by the Google Antigravity AI pair programmer for GpxRoute°.
Session 001: Project Inception & Clean Slate Reset
- Date: 2026-08-24
- Prompt Summary: Wipe template code, preserve README, establish bespoke styling without Tailwind CSS, and document the entire architectural evolution.
- Actions Taken:
- Removed boilerplate code and dependencies.
- Initialized Next.js 16 App Router with Redux Toolkit and CSS Modules.
- Formulated the 5-Phase Technical Blueprint (
docs/architecture.md,docs/roadmap.md).
Session 002: Core Design Token System & UI Primitives
- Date: 2026-08-24
- Prompt Summary: Construct bespoke CSS token system, light/dark themes, and atomic UI primitives (Button, Card, Badge, Modal).
- Actions Taken:
- Created
src/styles/tokens.csswith semantic variables. - Implemented component primitives with zero external UI dependencies.
Session 003: Architectural Planning & Project Roadmap
- Date: 2026-08-24
- Prompt Summary: Align on Firestore architecture and 5-phase roadmap.
Session 004: Phase 2 GPX Engine & Mapbox 3D Visualization
- Date: 2026-08-24
- Prompt Summary: Build client-side GPX XML parser, geospatial analytics calculator, 3D Mapbox terrain engine with dynamic line gradients, cinematic camera playback controller, and synchronized interactive elevation chart.
Session 005: Phase 3 Scoped Firebase Auth & Firestore Persistence
- Date: 2026-08-24
- Prompt Summary: Integrate Firebase Auth (Google & Email) and Firestore persistence with an isolated single-collection architecture (
gpxroute/app/...).
Session 006: Comprehensive Testing Suite & Quality Assurance
- Date: 2026-08-24
- Prompt Summary: Introduce exhaustive automated testing: Vitest unit testing, React Testing Library component integration, and Playwright E2E browser testing.
- Actions Taken: Built 6 test suites with 41 passing tests and `docs/testing.md`.
Session 007: Phase 4 Social Share Cards & Resend Emails
- Date: 2026-08-24
- Prompt Summary: Implement high-resolution client-side HTML5 Canvas Social Card Generator (9:16 Story, 16:9 Landscape, 1:1 Square), interactive multi-tab Share Modal with QR code for mobile scanning, and Resend transactional email share API.
- Actions Taken: Built social card engine, email client,
/api/email/share, andShareModal.tsxwith 50 passing tests.
Session 008: Design System Transformation (Swiss Modernist & Zero-Radius Geometry)
- Date: 2026-08-24
- Prompt Summary: Overhaul the entire look and feel: reject dark cyber glows and rounded corners in favor of a clean, light, architectural, Swiss-inspired aesthetic with strict 0px geometry and permanent light mode.
Session 009: Phase 5 Stripe Monetization & Production Polish
- Date: 2026-08-24
- Prompt Summary: Implement Stripe Checkout Sessions (
/api/stripe/checkout), cryptographic HMAC Webhook verification (/api/stripe/webhook), Pro Tier perks,UpgradeModal.tsx, and final production verification.
Session 010: Advanced Capabilities & CI/CD Pipeline
- Date: 2026-08-24
- Prompt Summary: Implement Catmull-Rom smooth 3D drone camera tracking, 3D terrain split & summit flags, WebGL 60FPS video flyover export, Strava OAuth activity ingestion, and automated GitHub Actions CI/CD.
- Actions Taken:
- Built
src/lib/geo/splineInterpolator.tsfor Catmull-Rom cubic spline interpolation. - Built
src/lib/video/flyoverRecorder.tsfor client-side WebGL canvas 60FPS video recording. - Built
src/lib/strava/stravaClient.tswith@mapbox/polylinedecoding and/api/auth/strava+/api/strava/callback+/api/strava/activities. - Built
StravaSyncModal.tsxfor 1-click athlete sync. - Configured
.github/workflows/ci.ymlandvercel.json. - Added unit test suites (
spline.test.ts,strava.test.ts). - Verification:
- Ran
pnpm test— 62 / 62 tests passing across 12 test suites. - Ran
pnpm test:e2e— 10 / 10 Playwright E2E browser tests passing. - Ran
pnpm build— Zero errors, 8 dynamic & static routes compiled.